Summary
Overview
Work History
Education
Skills
Timeline
ProjectManager

TRIET LE

Project Manager
Thu Duc City, Ho Chi Minh City

Summary

Focused Project Manager adept at planning, directing and maintaining continuous operations in various departments. Experienced in directing manufacturing employees and keeping efficient production in accordance with quality standards. Applying creative and analytical approach to operations for continuous process improvement. Skilled at identifying or anticipating problems and providing solutions. Excels through mentoring, training and empowering team to excel in performance.

Overview

15
15
years of professional experience
6
6
years of post-secondary education

Work History

Senior Project Engineer

Schindler Elevators & Escalators
Ho Chi Minh City
04.2018 - Current
  • Company leading in Elevator and Escalator, Key tasks:
  • Developed and initiated projects, managed costs and monitored performance.
    Maintained relationships with material vendors to lower costs and diversify capabilities.
    Assessed scope and requirements to assist with project design determinations.
    Accelerated progress by continually reviewing performance, budgets and project timelines.
    Identified plans and resources required to meet project goals and objectives.
    Planned, designed and scheduled phases for large projects.
  • Conduct a risk assessment to identify risks, and plan a response to treating the risk
  • Some VN big projects contributing to managing such as The Sun Avenue, Thao Dien Gateway, Five Star Tower, Hung Phat, River Panorama,…

Senior Layout Engineer

Schindler Elevators & Escalators
Ho Chi Minh City
12.2010 - 04.2018
  • Who prepare and check technical drawings, relative technical issues, draw major project for Schindler’s project in Viet Nam
  • Deal with all requests for drawings from Sales Dept.,
  • Consult customers to help them have optimal products for their needs
  • Draw and check all design works to make sure that all drawings are performed by Schindler’s installation standards
  • Training new staff the knowledge of elevator and the processing how to work - Be responsible for drawing modifications from all while-installation changes against first approved drawings
  • Manage and distribute approved drawings to related Depts
  • Some VN big projects contributing to a designation such as Vietin Bank, Sai Gon Center, Da Nang Admin, Binh Duong Admin, Lotte Center (Ha Noi), Viglacera Tower (Ha Noi),…, ., Ltd


Chief Designer

Cosmo Co., Ltd
11.2009 - 12.2010
  • Korean Company in Door manufacturing in Vietnam, who manages and controls all technical documentation of door designs
  • Key tasks: - Check, control, and handle all documents, reports, emails related to customer requirements, business contracts with technical aspects, and manufacturing
  • Check design works and make the official quotation for the customer
  • Cooperate with Plant Manager and Sales Manager to speed up the manufacturing process and product procurement
  • Consult customers to help them have optimal products with the lowest possible price for their needs.

Designer Engineer

Denki Sekisan Group
03.2009 - 09.2009
  • Designs electrical systems
  • Key tasks: - Design electrical systems (lighting, sound, fire alarm, lighting proof, etc.)
  • Check and edit design works to meet the client’s expectations and requirements
  • Complete and assure all the design work on time and meet the client’s standards
  • Collect all data resources relating to design jobs and customer requests, which are helpful for all team’s work accomplishments
  • Key Responsibilities: - Be in charge of techniques to make designs most suitable for different clients
  • Control all processes to achieve high-quality designs and complete them on time
  • Be in charge of keeping confidential information systems and confidential data of Japanese clients (name, business, operations, technologies, technical aspects of client’s desired products…) - Manage database and fact sheets of all projects
  • Contact with Japanese customers.

Design Engineer

Takara Standard Group
04.2007 - 03.2009
  • Complete design works on time with their high quality and technical accuracy.
  • - Contact with Japanese customers.
  • - Follow up quality standards to ensure that services are maintained at the necessary level to keep customer satisfaction.
  • - Carry out customer satisfaction surveys to identify an appropriate service level for each area including quality and accuracy of drawing.
  • - Supervise information receiving and specification requests from Japanese customers, then do good working plans for a whole team to do, to assure the projects will be finished before the deadline.
  • - Manage teamwork and encourage staffs’ strong motivation to perform more effectively and accurately.

Electrical Designer (Supervisor)

HTG Engineering & Trading Co
08.2006 - 03.2007
  • My customers are Japanese
  • Key tasks: - Supervise building and construction projects
  • Make drawing designs of electricity systems
  • Check and edit drawing designs if necessary to match with the realistic situation
  • Contact customers
  • Prepare reports as the projects are finished.
  • Demonstrated respect, friendliness and willingness to help wherever needed
  • Adhered to social distancing protocols and wore mask or face shield
  • Increased customer satisfaction by resolving issues
  • Identified issues, analyzed information and provided solutions to problems
  • Delivered services to customer locations within specific time frames

Education

Business Administration: Certified -

University of Economics Ho Chi Minh
Ho Chi Minh City, SG
05.2012 - 12.2012

S5500 Training” in Malaysia -

Schindler Training Center
Malaysia
01.2011 - 01.2011

Basic Training for high rise elevator” in -

Schindler Hong Kong
Hong Kong
01.2011 - 04.2011

“Advanced Training for high rise elevator” in -

Schindler Training Center
Malaysia
09.2011 - 11.2011

“Layout engineering certificate” in Singapore -

Schindler Training Center
Singapore
10.2011 - 11.2011

"Layout engineer training and certificate SRL4” in -

Schindler Hong Kong Training Center
Hong Kong
03.2017 - 05.2017

Bachelor - Electrical Engineering

Ho Chi Minh City University of Technology (HUTEC)
Ho Chi Minh City, SG
01.2001 - 01.2006

Skills

Staff Management

undefined

Timeline

Senior Project Engineer

Schindler Elevators & Escalators
04.2018 - Current

"Layout engineer training and certificate SRL4” in -

Schindler Hong Kong Training Center
03.2017 - 05.2017

Business Administration: Certified -

University of Economics Ho Chi Minh
05.2012 - 12.2012

“Layout engineering certificate” in Singapore -

Schindler Training Center
10.2011 - 11.2011

“Advanced Training for high rise elevator” in -

Schindler Training Center
09.2011 - 11.2011

S5500 Training” in Malaysia -

Schindler Training Center
01.2011 - 01.2011

Basic Training for high rise elevator” in -

Schindler Hong Kong
01.2011 - 04.2011

Senior Layout Engineer

Schindler Elevators & Escalators
12.2010 - 04.2018

Chief Designer

Cosmo Co., Ltd
11.2009 - 12.2010

Designer Engineer

Denki Sekisan Group
03.2009 - 09.2009

Design Engineer

Takara Standard Group
04.2007 - 03.2009

Electrical Designer (Supervisor)

HTG Engineering & Trading Co
08.2006 - 03.2007

Bachelor - Electrical Engineering

Ho Chi Minh City University of Technology (HUTEC)
01.2001 - 01.2006
TRIET LEProject Manager