Nguyen Minh Tam

Nguyen Minh Tam

Vũng Tàu,43

Summary

Proactive and versatile with a dedication to quickly adapting to new challenges. Strong problem-solving abilities and a proven track record of fostering strong relationships with clients and team members. Focused on supporting team success and achieving positive results.

Overview

9
9
years of professional experience
1
1
Certification

Work History

UlliEstablishing the Manpowers & Equipments, Tools Using Within Time of Project/liliEstablishing & Controlling Construction Team and Construction Plan/liliPreparation for Audit by Contractor and Client/liliWelder Preparation for Qualify/liliDetermining Steps of Construction Sequence and Detailing Working Schedule/liliCost Controlling/liliMostly Activities at Site Undertaken and Controlled/liliInterfacing With Other Team Work/liliProject: Baltica 2 OSS & Fengmiao 1 OSS/liliClient: Ørsted & COP/liliWorking Location: Pv Shipyard Yard/li/ul

Lilama 18
10.2024 - Current
  • Established manpower, equipment, and tools within project timelines.
  • Controlled construction team and managed comprehensive construction plans.
  • Prepared documentation for audits by contractors and clients.
  • Qualified welders through rigorous preparation processes.
  • Determined construction sequence and detailed working schedules.
  • Monitored costs to ensure budget compliance throughout projects.
  • Oversaw site activities to maintain operational control and efficiency.
  • Interfaced with teams to facilitate collaboration on project deliverables.

<ul><li>Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.</li><li>Solve the technical issues that raised by the Sub-Contractor.</li><li>Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.</li><li>Control materials, drawing and production progess and share to Sub-Contractor information.</li><li>Control to ensure compliance with construction standard, procedures and quality.</li><li>Planning for construction and controlling</li><li>Coordinate team (QC, HSE…)</li><li>Monitor and control inspection activities compliance with project checklist and project requirement</li><li>Follow up and identify of NCRs, OSDs…</li><li>Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204</li><li>Client: Ørsted</li><li>Working location: PTSC Yard</li></ul>

PetroVietNam Technical Services Coporation - PTSC
08.2023 - 10.2024
  • Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.
  • Solve the technical issues that raised by the Sub-Contractor.
  • Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.
  • Control materials, drawing and production progess and share to Sub-Contractor information.
  • Control to ensure compliance with construction standard, procedures and quality.
  • Planning for construction and controlling
  • Coordinate team (QC, HSE…)
  • Monitor and control inspection activities compliance with project checklist and project requirement
  • Follow up and identify of NCRs, OSDs…
  • Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204
  • Client: Ørsted
  • Working location: PTSC Yard

<ul><li>Preparation and qualify for welder</li><li>Prepairation and qualify for painter</li><li>Materials checking before packing and sending to offshore</li><li>Review & comment workpack and jobcard</li><li>Offshore working supervision</li><li>Internal plan working (schedule, duration, materials, manpower..)</li><li>Offshore working that why should be thinking how to minize time of works</li><li>Monitoring fabrication & installation deck extension, modification for existing structure</li><li>Monitoring process of fabrication & installation pipe support, pipe spool</li><li>Testing works monitoring process.</li><li>Coodinate team and other team , 3rd parties for next step of works.</li><li>Overall monitoring at site to ensure safety and qualities</li><li>Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)</li><li>Making daily report to manager, or verbal report to FOPs.</li><li>Project: Gallaf Batch 3 Modification & HUC</li><li>Client: DSME (Contractor), NOC (Client)</li><li>Working location: POS workshop and Offshore Al Shaheen Field (Qatar)</li></ul>

PTSC Offshore Services (POS)
12.2022 - 08.2023
  • Preparation and qualify for welder
  • Prepairation and qualify for painter
  • Materials checking before packing and sending to offshore
  • Review & comment workpack and jobcard
  • Offshore working supervision
  • Internal plan working (schedule, duration, materials, manpower..)
  • Offshore working that why should be thinking how to minize time of works
  • Monitoring fabrication & installation deck extension, modification for existing structure
  • Monitoring process of fabrication & installation pipe support, pipe spool
  • Testing works monitoring process.
  • Coodinate team and other team , 3rd parties for next step of works.
  • Overall monitoring at site to ensure safety and qualities
  • Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)
  • Making daily report to manager, or verbal report to FOPs.
  • Project: Gallaf Batch 3 Modification & HUC
  • Client: DSME (Contractor), NOC (Client)
  • Working location: POS workshop and Offshore Al Shaheen Field (Qatar)

<ul><li>Reviewing and checking DWG then distribution to team</li><li>Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule</li><li>Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project</li><li>Co-ordinate with team and QC team to plan for inspection and issue release for next step of works</li><li>Joint team TBM and job instruction before starting daily, remind all of team about safety, quality</li><li>Follow up NCRs, OSDs</li><li>Advice & sharing idea to solving problem</li><li>Pre-view constrution sequence, method for next project</li><li>Daily reporting to manager</li><li>Project: SHWE PROJECT (CPP JACKET FABRICATION) SAPURA Jacket Loadout</li><li>Client: HUYNDAI (Contractor) POSCO International (Client)</li><li>Working Location: PTSC M&C Yard</li></ul>

PTSC Mechanical and Construction Limited Company
01.2022 - 12.2022
  • Reviewing and checking DWG then distribution to team
  • Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule
  • Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project
  • Co-ordinate with team and QC team to plan for inspection and issue release for next step of works
  • Joint team TBM and job instruction before starting daily, remind all of team about safety, quality
  • Follow up NCRs, OSDs
  • Advice & sharing idea to solving problem
  • Pre-view constrution sequence, method for next project
  • Daily reporting to manager
  • Project: SHWE PROJECT (CPP JACKET FABRICATION) SAPURA Jacket Loadout
  • Client: HUYNDAI (Contractor) POSCO International (Client)
  • Working Location: PTSC M&C Yard

<ul><li>To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation</li><li>Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule</li><li>Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)</li><li>Monitoring Installation Concrete Pipe Rack works.</li><li>Monitoring Fabrication & Installation Pipe Support, Pipe Spool (AG)</li><li>Project: Long Son Petrochemical Complex Plant – A1 Package</li><li>Client: TPSK (Contractor), Long Son (Client)</li><li>Working Location: Long Son site – Viet Nam</li></ul>

PTSC Offshore Services (POS)
04.2019 - 12.2021
  • To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation
  • Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule
  • Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)
  • Monitoring Installation Concrete Pipe Rack works.
  • Monitoring Fabrication & Installation Pipe Support, Pipe Spool (AG)
  • Project: Long Son Petrochemical Complex Plant – A1 Package
  • Client: TPSK (Contractor), Long Son (Client)
  • Working Location: Long Son site – Viet Nam

<ul><li>Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated</li><li>Discussion with construction team then issue for suitable with sequence of construction team</li><li>The drawing issue are compliant with specs and standard of project</li><li>Supervise and manage activities at site to control the progress inline overall plan</li><li>Control materials, Equipments Drawing and manpower</li><li>Supervise job : Fabrication & Installation Jacket Frame</li><li>Supervise job : Fabrication & Installation Deck Frame (Topside)</li><li>Supervise job : Loadout and sea fastenning for Jacket</li><li>Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book</li><li>Plan for Re-testing and calibration for Equipments</li><li>Co-ordinate team and HSE QC… to prepair ready for works</li><li>Prepairation and checking ready for audit of next project comming</li><li>Daily reporting to manager</li><li>Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication</li><li>Client: IDEMISU</li><li>Working Location: PTSC M&C Yard</li></ul>

PTSC Mechanical and Construction Limited Company
11.2018 - 04.2020
  • Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated
  • Discussion with construction team then issue for suitable with sequence of construction team
  • The drawing issue are compliant with specs and standard of project
  • Supervise and manage activities at site to control the progress inline overall plan
  • Control materials, Equipments Drawing and manpower
  • Supervise job : Fabrication & Installation Jacket Frame
  • Supervise job : Fabrication & Installation Deck Frame (Topside)
  • Supervise job : Loadout and sea fastenning for Jacket
  • Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book
  • Plan for Re-testing and calibration for Equipments
  • Co-ordinate team and HSE QC… to prepair ready for works
  • Prepairation and checking ready for audit of next project comming
  • Daily reporting to manager
  • Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication
  • Client: IDEMISU
  • Working Location: PTSC M&C Yard

<ul><li>Site supervision under assigned work by leader</li><li>Plan working (Schedule, duration, materials, manpower…)</li><li>Supervise job: Fabrication modules and final assembly</li><li>Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing</li><li>Checking sequence from sub-contractor included Lifting plan</li><li>Joint team TBM and instruction about job and keep safe during working</li><li>Daily reporting to manager</li><li>Project: Ca Hoi (Barge Fabrication)</li><li>Client: Steinsvik</li><li>Working Location: PV Shipyard Yard</li></ul>

PetroVietnam Marine Shipyard (PV Shipyard)
08.2017 - 11.2018
  • Site supervision under assigned work by leader
  • Plan working (Schedule, duration, materials, manpower…)
  • Supervise job: Fabrication modules and final assembly
  • Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing
  • Checking sequence from sub-contractor included Lifting plan
  • Joint team TBM and instruction about job and keep safe during working
  • Daily reporting to manager
  • Project: Ca Hoi (Barge Fabrication)
  • Client: Steinsvik
  • Working Location: PV Shipyard Yard

<ul><li>Engineering work and workshop supervision</li><li>Plan work (Duration, manpower..)</li><li>Weekly maintainance for rolling & bending machine</li><li>Fabrication & Installation Steel Structure Modules</li><li>Bending & Rolling monitor process</li><li>Safe working</li><li>Daily report</li><li>Project: Rolling, Bending and fabrication steel structure modules</li><li>Client: TLC Company</li><li>Working Location: Tan Thanh Workshop</li></ul>

Tan Thanh Company
07.2017 - 08.2017
  • Engineering work and workshop supervision
  • Plan work (Duration, manpower..)
  • Weekly maintainance for rolling & bending machine
  • Fabrication & Installation Steel Structure Modules
  • Bending & Rolling monitor process
  • Safe working
  • Daily report
  • Project: Rolling, Bending and fabrication steel structure modules
  • Client: TLC Company
  • Working Location: Tan Thanh Workshop

<ul><li>Working Location: Vietso petro Workshop</li></ul>

Ha Noi University of Mining and Geology
08.2016 - 01.2017
  • Working Location: Vietso petro Workshop

Education

Petroleum Equipment

01/2017
01.2017

Skills

  • Construction supervision
  • Technical problem solving
  • Construction planning
  • Team coordination
  • Safety management
  • Leadership skills
  • Construction supervision
  • Technical problem solving

Certification

  • Lifting Supervisor Certification
  • Certificate of HSE supervisor
  • Magnetic Particle Testing Level II
  • GOLDEN RULES CERTIFICATE
  • Certificate “ Hazard Identification & Risk Assessment”
  • T-BOSIET (OPITO)
  • H2S Certificate (OPITO)
  • Supervisor’s safety Leadership Cert (By CSR NOC)
  • Certificate: Banksman level 3 and Rigger level 1 (OPITO)
  • Internal training by PTSC M&C: Flange management
  • Internal training by PTSC M&C: Project management
  • Internal training by PTSC M&C: Welding Supervisor

Timeline

UlliEstablishing the Manpowers & Equipments, Tools Using Within Time of Project/liliEstablishing & Controlling Construction Team and Construction Plan/liliPreparation for Audit by Contractor and Client/liliWelder Preparation for Qualify/liliDetermining Steps of Construction Sequence and Detailing Working Schedule/liliCost Controlling/liliMostly Activities at Site Undertaken and Controlled/liliInterfacing With Other Team Work/liliProject: Baltica 2 OSS & Fengmiao 1 OSS/liliClient: Ørsted & COP/liliWorking Location: Pv Shipyard Yard/li/ul

Lilama 18
10.2024 - Current

<ul><li>Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.</li><li>Solve the technical issues that raised by the Sub-Contractor.</li><li>Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.</li><li>Control materials, drawing and production progess and share to Sub-Contractor information.</li><li>Control to ensure compliance with construction standard, procedures and quality.</li><li>Planning for construction and controlling</li><li>Coordinate team (QC, HSE…)</li><li>Monitor and control inspection activities compliance with project checklist and project requirement</li><li>Follow up and identify of NCRs, OSDs…</li><li>Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204</li><li>Client: Ørsted</li><li>Working location: PTSC Yard</li></ul>

PetroVietNam Technical Services Coporation - PTSC
08.2023 - 10.2024

<ul><li>Preparation and qualify for welder</li><li>Prepairation and qualify for painter</li><li>Materials checking before packing and sending to offshore</li><li>Review & comment workpack and jobcard</li><li>Offshore working supervision</li><li>Internal plan working (schedule, duration, materials, manpower..)</li><li>Offshore working that why should be thinking how to minize time of works</li><li>Monitoring fabrication & installation deck extension, modification for existing structure</li><li>Monitoring process of fabrication & installation pipe support, pipe spool</li><li>Testing works monitoring process.</li><li>Coodinate team and other team , 3rd parties for next step of works.</li><li>Overall monitoring at site to ensure safety and qualities</li><li>Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)</li><li>Making daily report to manager, or verbal report to FOPs.</li><li>Project: Gallaf Batch 3 Modification & HUC</li><li>Client: DSME (Contractor), NOC (Client)</li><li>Working location: POS workshop and Offshore Al Shaheen Field (Qatar)</li></ul>

PTSC Offshore Services (POS)
12.2022 - 08.2023

<ul><li>Reviewing and checking DWG then distribution to team</li><li>Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule</li><li>Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project</li><li>Co-ordinate with team and QC team to plan for inspection and issue release for next step of works</li><li>Joint team TBM and job instruction before starting daily, remind all of team about safety, quality</li><li>Follow up NCRs, OSDs</li><li>Advice & sharing idea to solving problem</li><li>Pre-view constrution sequence, method for next project</li><li>Daily reporting to manager</li><li>Project: SHWE PROJECT (CPP JACKET FABRICATION) SAPURA Jacket Loadout</li><li>Client: HUYNDAI (Contractor) POSCO International (Client)</li><li>Working Location: PTSC M&C Yard</li></ul>

PTSC Mechanical and Construction Limited Company
01.2022 - 12.2022

<ul><li>To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation</li><li>Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule</li><li>Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)</li><li>Monitoring Installation Concrete Pipe Rack works.</li><li>Monitoring Fabrication & Installation Pipe Support, Pipe Spool (AG)</li><li>Project: Long Son Petrochemical Complex Plant – A1 Package</li><li>Client: TPSK (Contractor), Long Son (Client)</li><li>Working Location: Long Son site – Viet Nam</li></ul>

PTSC Offshore Services (POS)
04.2019 - 12.2021

<ul><li>Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated</li><li>Discussion with construction team then issue for suitable with sequence of construction team</li><li>The drawing issue are compliant with specs and standard of project</li><li>Supervise and manage activities at site to control the progress inline overall plan</li><li>Control materials, Equipments Drawing and manpower</li><li>Supervise job : Fabrication & Installation Jacket Frame</li><li>Supervise job : Fabrication & Installation Deck Frame (Topside)</li><li>Supervise job : Loadout and sea fastenning for Jacket</li><li>Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book</li><li>Plan for Re-testing and calibration for Equipments</li><li>Co-ordinate team and HSE QC… to prepair ready for works</li><li>Prepairation and checking ready for audit of next project comming</li><li>Daily reporting to manager</li><li>Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication</li><li>Client: IDEMISU</li><li>Working Location: PTSC M&C Yard</li></ul>

PTSC Mechanical and Construction Limited Company
11.2018 - 04.2020

<ul><li>Site supervision under assigned work by leader</li><li>Plan working (Schedule, duration, materials, manpower…)</li><li>Supervise job: Fabrication modules and final assembly</li><li>Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing</li><li>Checking sequence from sub-contractor included Lifting plan</li><li>Joint team TBM and instruction about job and keep safe during working</li><li>Daily reporting to manager</li><li>Project: Ca Hoi (Barge Fabrication)</li><li>Client: Steinsvik</li><li>Working Location: PV Shipyard Yard</li></ul>

PetroVietnam Marine Shipyard (PV Shipyard)
08.2017 - 11.2018

<ul><li>Engineering work and workshop supervision</li><li>Plan work (Duration, manpower..)</li><li>Weekly maintainance for rolling & bending machine</li><li>Fabrication & Installation Steel Structure Modules</li><li>Bending & Rolling monitor process</li><li>Safe working</li><li>Daily report</li><li>Project: Rolling, Bending and fabrication steel structure modules</li><li>Client: TLC Company</li><li>Working Location: Tan Thanh Workshop</li></ul>

Tan Thanh Company
07.2017 - 08.2017

<ul><li>Working Location: Vietso petro Workshop</li></ul>

Ha Noi University of Mining and Geology
08.2016 - 01.2017

Petroleum Equipment

01/2017
Nguyen Minh Tam