Proactive and versatile with a dedication to quickly adapting to new challenges. Strong problem-solving abilities and a proven track record of fostering strong relationships with clients and team members. Focused on supporting team success and achieving positive results.
Overview
9
9
years of professional experience
1
1
Certification
Work History
UlliEstablishing the Manpowers & Equipments, Tools Using Within Time of Project/liliEstablishing & Controlling Construction Team and Construction Plan/liliPreparation for Audit by Contractor and Client/liliWelder Preparation for Qualify/liliDetermining Steps of Construction Sequence and Detailing Working Schedule/liliCost Controlling/liliMostly Activities at Site Undertaken and Controlled/liliInterfacing With Other Team Work/liliProject: Baltica 2 OSS & Fengmiao 1 OSS/liliClient: Ørsted & COP/liliWorking Location: Pv Shipyard Yard/li/ul
Lilama 18
10.2024 - Current
Established manpower, equipment, and tools within project timelines.
Controlled construction team and managed comprehensive construction plans.
Prepared documentation for audits by contractors and clients.
Qualified welders through rigorous preparation processes.
Determined construction sequence and detailed working schedules.
Monitored costs to ensure budget compliance throughout projects.
Oversaw site activities to maintain operational control and efficiency.
Interfaced with teams to facilitate collaboration on project deliverables.
<ul><li>Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.</li><li>Solve the technical issues that raised by the Sub-Contractor.</li><li>Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.</li><li>Control materials, drawing and production progess and share to Sub-Contractor information.</li><li>Control to ensure compliance with construction standard, procedures and quality.</li><li>Planning for construction and controlling</li><li>Coordinate team (QC, HSE…)</li><li>Monitor and control inspection activities compliance with project checklist and project requirement</li><li>Follow up and identify of NCRs, OSDs…</li><li>Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204</li><li>Client: Ørsted</li><li>Working location: PTSC Yard</li></ul>
PetroVietNam Technical Services Coporation - PTSC
08.2023 - 10.2024
Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.
Solve the technical issues that raised by the Sub-Contractor.
Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.
Control materials, drawing and production progess and share to Sub-Contractor information.
Control to ensure compliance with construction standard, procedures and quality.
Planning for construction and controlling
Coordinate team (QC, HSE…)
Monitor and control inspection activities compliance with project checklist and project requirement
Follow up and identify of NCRs, OSDs…
Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204
Client: Ørsted
Working location: PTSC Yard
<ul><li>Preparation and qualify for welder</li><li>Prepairation and qualify for painter</li><li>Materials checking before packing and sending to offshore</li><li>Review & comment workpack and jobcard</li><li>Offshore working supervision</li><li>Internal plan working (schedule, duration, materials, manpower..)</li><li>Offshore working that why should be thinking how to minize time of works</li><li>Monitoring fabrication & installation deck extension, modification for existing structure</li><li>Monitoring process of fabrication & installation pipe support, pipe spool</li><li>Testing works monitoring process.</li><li>Coodinate team and other team , 3rd parties for next step of works.</li><li>Overall monitoring at site to ensure safety and qualities</li><li>Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)</li><li>Making daily report to manager, or verbal report to FOPs.</li><li>Project: Gallaf Batch 3 Modification & HUC</li><li>Client: DSME (Contractor), NOC (Client)</li><li>Working location: POS workshop and Offshore Al Shaheen Field (Qatar)</li></ul>
PTSC Offshore Services (POS)
12.2022 - 08.2023
Preparation and qualify for welder
Prepairation and qualify for painter
Materials checking before packing and sending to offshore
Review & comment workpack and jobcard
Offshore working supervision
Internal plan working (schedule, duration, materials, manpower..)
Offshore working that why should be thinking how to minize time of works
Monitoring fabrication & installation deck extension, modification for existing structure
Monitoring process of fabrication & installation pipe support, pipe spool
Testing works monitoring process.
Coodinate team and other team , 3rd parties for next step of works.
Overall monitoring at site to ensure safety and qualities
Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)
Making daily report to manager, or verbal report to FOPs.
Project: Gallaf Batch 3 Modification & HUC
Client: DSME (Contractor), NOC (Client)
Working location: POS workshop and Offshore Al Shaheen Field (Qatar)
<ul><li>Reviewing and checking DWG then distribution to team</li><li>Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule</li><li>Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project</li><li>Co-ordinate with team and QC team to plan for inspection and issue release for next step of works</li><li>Joint team TBM and job instruction before starting daily, remind all of team about safety, quality</li><li>Follow up NCRs, OSDs</li><li>Advice & sharing idea to solving problem</li><li>Pre-view constrution sequence, method for next project</li><li>Daily reporting to manager</li><li>Project: SHWE PROJECT (CPP JACKET FABRICATION) SAPURA Jacket Loadout</li><li>Client: HUYNDAI (Contractor) POSCO International (Client)</li><li>Working Location: PTSC M&C Yard</li></ul>
PTSC Mechanical and Construction Limited Company
01.2022 - 12.2022
Reviewing and checking DWG then distribution to team
Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule
Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project
Co-ordinate with team and QC team to plan for inspection and issue release for next step of works
Joint team TBM and job instruction before starting daily, remind all of team about safety, quality
Follow up NCRs, OSDs
Advice & sharing idea to solving problem
Pre-view constrution sequence, method for next project
Client: HUYNDAI (Contractor) POSCO International (Client)
Working Location: PTSC M&C Yard
<ul><li>To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation</li><li>Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule</li><li>Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)</li><li>Monitoring Installation Concrete Pipe Rack works.</li><li>Monitoring Fabrication & Installation Pipe Support, Pipe Spool (AG)</li><li>Project: Long Son Petrochemical Complex Plant – A1 Package</li><li>Client: TPSK (Contractor), Long Son (Client)</li><li>Working Location: Long Son site – Viet Nam</li></ul>
PTSC Offshore Services (POS)
04.2019 - 12.2021
To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation
Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule
Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)
Project: Long Son Petrochemical Complex Plant – A1 Package
Client: TPSK (Contractor), Long Son (Client)
Working Location: Long Son site – Viet Nam
<ul><li>Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated</li><li>Discussion with construction team then issue for suitable with sequence of construction team</li><li>The drawing issue are compliant with specs and standard of project</li><li>Supervise and manage activities at site to control the progress inline overall plan</li><li>Control materials, Equipments Drawing and manpower</li><li>Supervise job : Fabrication & Installation Jacket Frame</li><li>Supervise job : Fabrication & Installation Deck Frame (Topside)</li><li>Supervise job : Loadout and sea fastenning for Jacket</li><li>Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book</li><li>Plan for Re-testing and calibration for Equipments</li><li>Co-ordinate team and HSE QC… to prepair ready for works</li><li>Prepairation and checking ready for audit of next project comming</li><li>Daily reporting to manager</li><li>Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication</li><li>Client: IDEMISU</li><li>Working Location: PTSC M&C Yard</li></ul>
PTSC Mechanical and Construction Limited Company
11.2018 - 04.2020
Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated
Discussion with construction team then issue for suitable with sequence of construction team
The drawing issue are compliant with specs and standard of project
Supervise and manage activities at site to control the progress inline overall plan
Control materials, Equipments Drawing and manpower
Supervise job : Loadout and sea fastenning for Jacket
Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book
Plan for Re-testing and calibration for Equipments
Co-ordinate team and HSE QC… to prepair ready for works
Prepairation and checking ready for audit of next project comming
Daily reporting to manager
Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication
Client: IDEMISU
Working Location: PTSC M&C Yard
<ul><li>Site supervision under assigned work by leader</li><li>Plan working (Schedule, duration, materials, manpower…)</li><li>Supervise job: Fabrication modules and final assembly</li><li>Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing</li><li>Checking sequence from sub-contractor included Lifting plan</li><li>Joint team TBM and instruction about job and keep safe during working</li><li>Daily reporting to manager</li><li>Project: Ca Hoi (Barge Fabrication)</li><li>Client: Steinsvik</li><li>Working Location: PV Shipyard Yard</li></ul>
PetroVietnam Marine Shipyard (PV Shipyard)
08.2017 - 11.2018
Site supervision under assigned work by leader
Plan working (Schedule, duration, materials, manpower…)
Supervise job: Fabrication modules and final assembly
Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing
Checking sequence from sub-contractor included Lifting plan
Joint team TBM and instruction about job and keep safe during working
Daily reporting to manager
Project: Ca Hoi (Barge Fabrication)
Client: Steinsvik
Working Location: PV Shipyard Yard
<ul><li>Engineering work and workshop supervision</li><li>Plan work (Duration, manpower..)</li><li>Weekly maintainance for rolling & bending machine</li><li>Fabrication & Installation Steel Structure Modules</li><li>Bending & Rolling monitor process</li><li>Safe working</li><li>Daily report</li><li>Project: Rolling, Bending and fabrication steel structure modules</li><li>Client: TLC Company</li><li>Working Location: Tan Thanh Workshop</li></ul>
Certificate: Banksman level 3 and Rigger level 1 (OPITO)
Internal training by PTSC M&C: Flange management
Internal training by PTSC M&C: Project management
Internal training by PTSC M&C: Welding Supervisor
Timeline
UlliEstablishing the Manpowers & Equipments, Tools Using Within Time of Project/liliEstablishing & Controlling Construction Team and Construction Plan/liliPreparation for Audit by Contractor and Client/liliWelder Preparation for Qualify/liliDetermining Steps of Construction Sequence and Detailing Working Schedule/liliCost Controlling/liliMostly Activities at Site Undertaken and Controlled/liliInterfacing With Other Team Work/liliProject: Baltica 2 OSS & Fengmiao 1 OSS/liliClient: Ørsted & COP/liliWorking Location: Pv Shipyard Yard/li/ul
Lilama 18
10.2024 - Current
<ul><li>Review and comment the method statement, construction proceedure, construction methodology of Sub-Contractor.</li><li>Solve the technical issues that raised by the Sub-Contractor.</li><li>Follow up closely Sub-Contractor to assist and chase up them smoothly working achiverment overall plan of the project.</li><li>Control materials, drawing and production progess and share to Sub-Contractor information.</li><li>Control to ensure compliance with construction standard, procedures and quality.</li><li>Planning for construction and controlling</li><li>Coordinate team (QC, HSE…)</li><li>Monitor and control inspection activities compliance with project checklist and project requirement</li><li>Follow up and identify of NCRs, OSDs…</li><li>Project: GREATER CHANGHUA OFFSHORE WINDFARM 2204</li><li>Client: Ørsted</li><li>Working location: PTSC Yard</li></ul>
PetroVietNam Technical Services Coporation - PTSC
08.2023 - 10.2024
<ul><li>Preparation and qualify for welder</li><li>Prepairation and qualify for painter</li><li>Materials checking before packing and sending to offshore</li><li>Review & comment workpack and jobcard</li><li>Offshore working supervision</li><li>Internal plan working (schedule, duration, materials, manpower..)</li><li>Offshore working that why should be thinking how to minize time of works</li><li>Monitoring fabrication & installation deck extension, modification for existing structure</li><li>Monitoring process of fabrication & installation pipe support, pipe spool</li><li>Testing works monitoring process.</li><li>Coodinate team and other team , 3rd parties for next step of works.</li><li>Overall monitoring at site to ensure safety and qualities</li><li>Job instruction before starting (detailing step of works, safety remind and request all team shall be complied)</li><li>Making daily report to manager, or verbal report to FOPs.</li><li>Project: Gallaf Batch 3 Modification & HUC</li><li>Client: DSME (Contractor), NOC (Client)</li><li>Working location: POS workshop and Offshore Al Shaheen Field (Qatar)</li></ul>
PTSC Offshore Services (POS)
12.2022 - 08.2023
<ul><li>Reviewing and checking DWG then distribution to team</li><li>Control materials, Equipments, Drawing and Production Plan and make sure almostly follow up overall schedule</li><li>Monitoring to ensure the construction & installation work team fully compliant with the drawing and spec or standard of project</li><li>Co-ordinate with team and QC team to plan for inspection and issue release for next step of works</li><li>Joint team TBM and job instruction before starting daily, remind all of team about safety, quality</li><li>Follow up NCRs, OSDs</li><li>Advice & sharing idea to solving problem</li><li>Pre-view constrution sequence, method for next project</li><li>Daily reporting to manager</li><li>Project: SHWE PROJECT (CPP JACKET FABRICATION) SAPURA Jacket Loadout</li><li>Client: HUYNDAI (Contractor) POSCO International (Client)</li><li>Working Location: PTSC M&C Yard</li></ul>
PTSC Mechanical and Construction Limited Company
01.2022 - 12.2022
<ul><li>To surpvise and manage sub-contractor carring out the production ensure follow sequence of works installation</li><li>Control materials, Equipments, Drawing and manpower to make sure construction progress reaching overall schedule</li><li>Monitoing process of Fabrication & Installation Steel Structure (Pipe Rack, Shelter..)</li><li>Monitoring Installation Concrete Pipe Rack works.</li><li>Monitoring Fabrication & Installation Pipe Support, Pipe Spool (AG)</li><li>Project: Long Son Petrochemical Complex Plant – A1 Package</li><li>Client: TPSK (Contractor), Long Son (Client)</li><li>Working Location: Long Son site – Viet Nam</li></ul>
PTSC Offshore Services (POS)
04.2019 - 12.2021
<ul><li>Issue shop drawing for construction (CP, PM, WM) as lastest AFC updated</li><li>Discussion with construction team then issue for suitable with sequence of construction team</li><li>The drawing issue are compliant with specs and standard of project</li><li>Supervise and manage activities at site to control the progress inline overall plan</li><li>Control materials, Equipments Drawing and manpower</li><li>Supervise job : Fabrication & Installation Jacket Frame</li><li>Supervise job : Fabrication & Installation Deck Frame (Topside)</li><li>Supervise job : Loadout and sea fastenning for Jacket</li><li>Monitor installation process of Equipments onto position then alignment and preservation works, instruction team before starting as manufacture book</li><li>Plan for Re-testing and calibration for Equipments</li><li>Co-ordinate team and HSE QC… to prepair ready for works</li><li>Prepairation and checking ready for audit of next project comming</li><li>Daily reporting to manager</li><li>Project: Ca Rong Do Project, Sao Vang CPP Jacket Fabrication, Sao Vang Topside Fabrication, Dai Nguyet WHP Topside Fabrication</li><li>Client: IDEMISU</li><li>Working Location: PTSC M&C Yard</li></ul>
PTSC Mechanical and Construction Limited Company
11.2018 - 04.2020
<ul><li>Site supervision under assigned work by leader</li><li>Plan working (Schedule, duration, materials, manpower…)</li><li>Supervise job: Fabrication modules and final assembly</li><li>Control and manage sub-contractor activities daily are safely, and make sure pre-fabrication and installation as drawing</li><li>Checking sequence from sub-contractor included Lifting plan</li><li>Joint team TBM and instruction about job and keep safe during working</li><li>Daily reporting to manager</li><li>Project: Ca Hoi (Barge Fabrication)</li><li>Client: Steinsvik</li><li>Working Location: PV Shipyard Yard</li></ul>
PetroVietnam Marine Shipyard (PV Shipyard)
08.2017 - 11.2018
<ul><li>Engineering work and workshop supervision</li><li>Plan work (Duration, manpower..)</li><li>Weekly maintainance for rolling & bending machine</li><li>Fabrication & Installation Steel Structure Modules</li><li>Bending & Rolling monitor process</li><li>Safe working</li><li>Daily report</li><li>Project: Rolling, Bending and fabrication steel structure modules</li><li>Client: TLC Company</li><li>Working Location: Tan Thanh Workshop</li></ul>
Tan Thanh Company
07.2017 - 08.2017
<ul><li>Working Location: Vietso petro Workshop</li></ul>