Summary
Overview
Work History
Education
Skills
Timeline
Generic
Long Hoai Bao Tam Pham

Long Hoai Bao Tam Pham

HSE Supervisor
Ho Chi Minh City

Summary

Qualification:

  • HSE (08 - 2021)
  • QAC (08 - 2021)
  • Certificate of Occupational Safety - Group 2 (02 - 2022)
  • Certificate of Fire Hazard & Rescue (04 - 2022)


GOALS:

  • Short-term: Financial stability to prepare for advanced study programs, obtain relevant certificates according to career requirements, and learn more foreign languages.
  • Long-term: Apply learned knowledge to work to gain more experience in actual operation and handling.

Overview

5
5
years of professional experience
4
4
years of post-secondary education

Work History

HSE Supervisor

FQM Corporation
10.2022 - Current
  • Project description:
  • Green Planet DC Warehouse & Office (Cu Chi, Ho Chi Minh City)
  • Scale: 5-story factory combined with office, total construction floor area: 141.761,19m2, and other ancillary works. Total land area: 4.6 Ha.


  • Akari Hoang Nam Residential area - Phase 2
  • Scale: 4 apartment blocks: 1 underground floor, 29 floors, 1 rooftop.


  • Truong Dinh Office & Commercial Tower (Thu Duc, Ho Chi Minh City)
  • Scale: 3 underground floors, 16 floors, 1 rooftop. Total land area: 1.080m2



  • Tasks description:
  • Controlling the input safety records of the main contractor.
  • Controlling safety records of construction equipment on site.
  • Witnessing, checking, and accepting safety works on the construction site.
  • Controlling the safety compliance of the main contractor on the construction site.
  • Organizing site walk between the Investor, the PMU, the Supervisory Board, and the NTC to check the site's compliance with safety and hygiene weekly.
  • Organizing safety meetings between the Supervisory Board and UBAT of NTC and related units.
  • Checking safety measures and hold a meeting to assess the safety of works with strict requirements between stakeholders before starting construction.

HSE Supervisor

G. P. L. Joint Stock Company
02.2022 - 10.2022
  • Project description:
  • Celadon Diamond Alnata Luxury Apartment Complex, Tan Phu, Ho Chi Minh City.
  • Scale: 4 apartment blocks: 1 underground floor, 14 floors.


  • Tasks description:
  • Inputting safety training for workers.
  • Preparing input safety records for workers.
  • Monitoring compliance with occupational safety, hygiene, and explosion prevention at the scene.
  • Conducting weekly safety training for workers.
  • Performing other assigned tasks under the direction of the project management board.

Freelancer

Family Business
07.2020 - 12.2021
  • Handling administrative documents on legibility/land ownership.
  • Directly contacting related & responsible government's departments to resolve procedural issues on legal ownership of real estate.
  • Creating contracts with related companies to determine location of land and road boundaries.
  • Provide and process service documents: apply for a construction permit, complete house's construction, apply for a house number...

Field Specialist & Lab Analyst

Ho Chi Minh City Science & Technology Joint Stock Company
10.2019 - 07.2020
  • Taking field samples according to requests of the contractor.
  • Analyzing samples based on criteria given by Head of Department.
  • Supervising lab's chemicals, equipments and machinery.
  • Listing necessary chemicals and equipments for purchase based on current inventory.
  • Creating quarterly list of equipments' conditions & statistics; planning of equipments' maintenance and calibration.
  • Taking part in operation ISO 1725 system.

Occupational Safety Supervisor & Consultant

Ho Chi Minh City Institute of Occupational Safety Science
06.2019 - 10.2019
  • Project Description:
  • Movenpick Resort Waverly (Phu Quoc, Kien Giang)
  • Scale: 329 hotel apartments, 79 villas and other surrounding facilities. Total area 51,62 Ha.


  • Checking legibility of personnel records and construction equipment entering and leaving the construction site of the construction contractors at the construction site to meet the requirements of laws and regulations of Vietnam.
  • Supervising contractors' workers to comply with labor safety during
    construction.
  • Inspecting actual construction methods and equipment at the construction site with strict requirements, ensuring safety in construction and by the provisions of law.
  • Performing other tasks assigned by the Project Management Board, Chief Supervising Consultant.

Member of Analyst Assistant Team

CIGG Project - Code D-180801
Da Lat
10.2018 - 04.2019
  • Surveilling and monitoring working site.
  • Collecting samples for analyzing
  • Analyzing collected samples and creating statistics table
  • Proposing management plans and agricultural waste treatment technology for Da Lat.

Education

Bachelor - Environmental Engineering

Van Lang University
Ho Chi Minh City, Vietnam
09.2015 - 06.2019

Skills

Logical & Critical Thinkingundefined

Timeline

HSE Supervisor

FQM Corporation
10.2022 - Current

HSE Supervisor

G. P. L. Joint Stock Company
02.2022 - 10.2022

Freelancer

Family Business
07.2020 - 12.2021

Field Specialist & Lab Analyst

Ho Chi Minh City Science & Technology Joint Stock Company
10.2019 - 07.2020

Occupational Safety Supervisor & Consultant

Ho Chi Minh City Institute of Occupational Safety Science
06.2019 - 10.2019

Member of Analyst Assistant Team

CIGG Project - Code D-180801
10.2018 - 04.2019

Bachelor - Environmental Engineering

Van Lang University
09.2015 - 06.2019
Long Hoai Bao Tam PhamHSE Supervisor